Environmental Monitoring


Kyushu Electric monitors and verifies the status of air and water quality, noise, and radioactivity in order to confirm the results of measures taken to protect the environment.
Continuous monitoring using environmental supervisory instruments
Telecamera monitoring
Patrol monitoring
Regular measurement and analysis
Reporting environmental data to related authorities
Example of environmental monitoring at a thermal power plant
Example of environmental monitoring at a thermal
As in the example, the environment surrounding power plants is controlled stringently through cooperation between the power plant, the related municipality, and companies in the area. So far, no accidents of any significance have occurred.



[Radioactivity inspection around the power plant]
With the cooperation of municipalities where nuclear power plants are located, Kyushu Electric conducts radioactivity inspections to confirm the absence of radioactive influences in the surrounding area.

Radioactivity inspection around the Sendai Nuclear Power Station
Radioactivity inspection around the Sendai Nuclear Power Station
* Monitoring station and post: Continuous measurement of radioactivity in the air
* Monitoring point: Measurement of total dosage for a certain period of time

The radioactivity dosage on people living near the power plants is less than 0.001mSv per year. This value is much lower than the 1mSv per year statutory dosage limit, and lower also than 0.05mSv, the target set by the Nuclear Safety Commission. Radioactivity inspection around the power plan
Radioactivity inspection around the power plant

Evaluation of dosage around the nuclear power plants
(Unit: mSv/year)
FY 1998 FY 1999
Genkai Nuclear Power Station Less than 0.001 Less than 0.001
Sendai Nuclear Power Station Less than 0.001 Less than 0.001

Overall environmental protection scheme at the thermal power plant (example)

Overall environmental protection scheme at the thermal power plant
1 Underwater discharge 15 Feed water pipe
2 Drainage taps 16 Steam turbine
3 Gypsum 17 Condenser
4 NOx continuous measurement facility 18 Water circulation pipe (intake)
5 SOx continuous measurement facility 19 Generator
6 Waste water treatment equipment 20 Sound insulating wall
7 Forced drain fan 21 Main transformer
8 Air heater 22 Water circulation pump
9 Ash treatment equipment 23 Cable
10 Ammonia injector 24 Switch
11 Gas mixing fan 25 Screen
12 Boiler 26 Intake
13 Safety valve muffler 27 Curtain wall
14 Water circulation pipe (drainage)  